System Engineer Main Plant and BOP
3-8 Years
B.E./B.Tech or M.E. / M. Tech Mechanical
Main Plant system design, BOP system design in Coal based plant and Combined Cycle plant .
Knowledge of Cooling water system, Main steam system, Feed water system, Gas Turbine, Steam turbine, Condenser.
Experience in Hydrogen Plant system design will be a great advantage.
Main Plant system Engineer
4-10 Years
B.E./B.Tech or M.E. / M. Tech Mechanical
Main Plant system design for thermal power plant and Combined Cycle Power plant, waste to energy , captive power plant.
Selection of Main plant equipment like Steam Turbine, Boiler, HRSG, Condenser , Feed water pumps etc. GATE CYCLE,THERMOFLEX is an added advantage,
Must have worked in detailed engineering projects for super critical project or combined cycle projects.
Please Note:-Please do needful and share this mail with your friends also.
Candidates meeting the above profile can rush their detailed CV immediately to ak***y@se**********e.com which should incorporate the following:-
1 Present Location
2 No. of years exp.
3 Present CTC
4 Expectation
5 Notice Period Required for Joining
Best Regards,
Akshay Karaniya
Seekout Online
E-mail ID:-ak***y@se**********e.com
Website:-https://www.seekoutonline.com/aboutus.php
Keyskills: feed water cycle condensers steam turbines bop hrsg mechanical design combined cycle cooling water gas turbine boiler