Job Description
Deviation report needs to be prepared by taking the following points into consideration
Deviation from the approved Design & Dimension.
Deviation from the approved Material.
Deviation from the approved Product Brands.
Deviation from the approved Quantity of Product.
Deviation from the approved Quality of Finishing.
a.Deviation inspection to be done within max 7 days of opening of store.
b.Ensure checking is done against the final signed layout.
c.Visit the store for deviation check.
d.Note down the deviations if any from the original drawing.
e.Understand the deviations are good/bad.
f.If good note and improve in next drawings.
g.If bad, speak to franchisee/ CMFs and get it corrected within 7 days.
h.Ensure the same is done and filed it with closure report after the deviations are rectified.
i.Get project estimate verified with respect to original estimates. Check for cost overruns.
Employement Category:
Employement Type: Full time
Industry: FMCG
Functional Area: Architecture
Role Category: Drafter
Role/Responsibilies: Projects Executive
Contact Details:
Company: Seagull International
Location(s): Mumbai